Call us for all of your critical repairs

Lee C. Moore technicians recently completed a time-critical repair of a mast in sub-zero temperatures.
This repair project was required before the mast could be lowered for a rig move. Two Lee C. Moore technicians worked with the customer’s crew, around the clock, to get the mast repaired and lowered safely.
 
Photo:  Jaylon Conner and rig at -25°F